Engineering Change Order

From Computer History Wiki
Revision as of 16:10, 14 December 2018 by Jnc (talk | contribs) (+cat)
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

An Engineering Change Order (usually given as the acronym, ECO) is an important piece of the paper trail for maintenance of a piece of equipment. If is a directive from the engineering organization, to both the manufacturing organization (for units yet to be built), and also to field service (for units already deployed) specifying a change in the design/implementation of a device - usually to correct an error which was not discovered until after the design had been 'frozen' and released from engineering.