Difference between revisions of "Engineering Change Order"

From Computer History Wiki
Jump to: navigation, search
(Created page with "An '''Engineering Change Order''' (usually given as the acronym, '''ECO''') is an important piece of the paper trail for maintenance of a piece of equipment. If is a directive...")
 
m (Correct cat)
Line 1: Line 1:
 
An '''Engineering Change Order''' (usually given as the acronym, '''ECO''') is an important piece of the paper trail for maintenance of a piece of equipment. If is a directive from the engineering organization, to both the manufacturing organization (for units yet to be built), and also to [[field service]] (for units already deployed) specifying a change in the design/implementation of a device - usually to correct an error which was not discovered until after the design had been 'frozen' and released from engineering.
 
An '''Engineering Change Order''' (usually given as the acronym, '''ECO''') is an important piece of the paper trail for maintenance of a piece of equipment. If is a directive from the engineering organization, to both the manufacturing organization (for units yet to be built), and also to [[field service]] (for units already deployed) specifying a change in the design/implementation of a device - usually to correct an error which was not discovered until after the design had been 'frozen' and released from engineering.
  
{{stub}}
+
{{semi-stub}}

Revision as of 20:28, 18 October 2018

An Engineering Change Order (usually given as the acronym, ECO) is an important piece of the paper trail for maintenance of a piece of equipment. If is a directive from the engineering organization, to both the manufacturing organization (for units yet to be built), and also to field service (for units already deployed) specifying a change in the design/implementation of a device - usually to correct an error which was not discovered until after the design had been 'frozen' and released from engineering.